Tuesday, December 6, 2011

End of day 2

Another wall. Realized tonight that I should have ordered long cables for hmdi and component. Had to pay for 2 day shipping to get them here on Thursday.

Monday, December 5, 2011

End of day 1

Cleared the first wall, redid a bunch of electrical work including a total rewire of the entry way box. It has 6 wires running into it. 4 to carry the line back to the attic (don't know why 3 went to the attic) and to the front wall. 1 to the outside porch light, and 1 going to the attic for future use in recessed lighting. Finished with the insulation right before dinner. Tomorrow I'll do the same with wall 2.

Sunday, December 4, 2011

Christmas Tree

In the closet of living room jr


Hard to see, but its in the closet of Living Room Jr.

Prep complete



So far...

- Ran Ethernet and coax to the basement thought the wall.
- Got the electrical, drywall, and insulation for the next couple of days
- Ordered appliances
- Selected counter top, cabinets and flooring (flooring was today)
- Bought a garbage disposal called the in-sink-erator.

How to be safe around swinging hammers

Living Room Jr

Family room moved to the spare bedroom. Kids junked it up to look like living room sr in no time