Saturday, November 24, 2012

Update going into Sunday

Cleaned up electrical and worked on one section of the water damaged floor.

Monday, November 19, 2012

End of day 1 bathroom demo

Removed toilet
Removed vanity
Removed final wall
Got 1/4 inch and 1/2 inch cement board.

Hi lights were having to go back to HD to get $ plug for toilet hole and having to cut toilet bolts with reciprocating saw.

Tomorrow will remove the short wall and rip out the floor.

Sunday, September 9, 2012

Weekend update

Almost finished (I feel like I've been saying that for weeks now). Just a small bit of painting and touch up work left. We finished most of the remaining painting including the downstairs closet and moved the tv and media stand to the family room.

Demo started on bathroom

Removed tile and wall for one wall

Sunday, February 19, 2012

Update

Molding/trim is completely installed except for the bay window. Still lots of painting to do. Also tv wall mount needs to be attached.

Sunday, February 12, 2012

Walls painted

Door frames

6 door frames

Making stuff

Still a lot of work to do. Installed the molding upstairs and on the sides of the stairs. Jamie is painting the final coat on the walls tonight and I'll be painting some quarter round.

Friday, February 3, 2012

Friday

Primed the stairway wall and back corner
Textured the hallway
Painted a bunch of trim

Also did a little compounding where my work was sloppy.

Monday, January 30, 2012

dRemodeling came in force

Jamie said they were everywhere. Tons got done. The water damage was repaired. The back corner walls were put up. The wall cabinets were installed. The hood was installed. Electric run in the island Everything has a coat of compound. I've been priming trim since I got home. Other sides in about an hour.

Island