Tuesday, November 9, 2010

Day 4






Finished what I thought I could for today. Put all 100 feet of R30 insulation in the crawl space and took the last wall from old rock to stapled insulation. It might be placebo effect but I feel like its warmer up there. I realized the void in the crawl space extends under the entire ceiling/floor between levels. All the heat from the first floor wouldn't make it to the second. It will now, hopefully it will help.

The crawl space job was terrible, but afterward I had a bowl of homemade chicken soup and a 60 minute IPA. It was a beautiful day, so warm it was actually hot in the crawl space. Erin and I did some swinging over lunch and we talked about the apple pie that her and mommy made.

Joel and I brought up 8 sheets of drywall tonight. All set for tomorrow.

No comments:

Post a Comment